MGC CIVIL WAS ENGAGED BY CD DODD SCRAP METAL RECYCLERS TO ASSIST WITH THE DELIVERY OF THE NEW RIDGID HARDSTAND AT THEIR DUNDAS ROAD DEPOT.
This project included:
- Site Clearance of 3,800m².
- Cut to fill earthworks to achieve the required design levels.
- Preparation and installation of 3,300m2 of concrete hard stand, including stormwater, 300mm limestone base and 200 mm heavy-duty reinforced concrete.
- Full construction of perimeter brick feature wall.
- Hard and soft landscaping including paving, reticulation, lawns and garden beds.
CLIENT: CD Dodd Scrap Metal Recyclers
SUPERINTENDENT: Serling Consulting Engineers
LOCATION: Helena Valley, Western Australia
SITE AREA: 3,800m²
DURATION: 28 weeks